After the 1,600-metre gabion seawall at Keri beach — constructed at a cost of Rs 4.2 crore in 2008 — disintegrated within three years, the tetrapod wall, which is considered to be one of the best sea protection measures, is fast eroding.
After the 1,600-metre gabion seawall at Keri beach — constructed at a cost of Rs 4.2 crore in 2008 — disintegrated within three years, the tetrapod wall, which is considered to be one of the best sea protection measures, is fast eroding.